PM · Superintendent · Public-project

Closeout

Retainage — often the whole margin — sits hostage to closeout.

Closeout fails because it's a thousand small chases nobody owns at the end of a tired job. Walter owns them from day one: it builds the closeout register at project start, manages punch with retainage linkage, assembles milestone packages, and drives the retainage-release query.

The problem

What this costs you today — and what Walter does instead.

The pain

O&Ms and warranties are chased a year after the sub's scope finished — too late.

With Walter

Walter builds the closeout register at project start and collects as work completes, not from substantial completion.

The pain

Nobody can say what's actually blocking final payment.

With Walter

A live traversal goes from the retainage ledger to unmet requirements to responsible party, sorted by dollar impact.

The pain

Warranty start dates are guessed, creating a year of exposure either way.

With Walter

Walter flags the substantial-completion vs. beneficial-occupancy distinction for human confirmation instead of assuming.

The workflow

How Walter runs it.

  1. 01

    Register at day one

    Extract closeout requirements per spec section at project start — O&Ms, warranties, training, attic stock, certifications.

  2. 02

    Punch

    Intake walk items, assign to subs with locations and citations, and track verify cycles with retainage linkage.

  3. 03

    Document assembly

    Check O&Ms against spec, cross-check approved submittals, and assemble the warranty matrix with start dates.

  4. 04

    Milestone packages

    Assemble substantial- and final-completion packages: certificate requests, regulatory sign-offs, training, as-builts, final waivers.

  5. 05

    Retainage drive

    Answer 'what's blocking final payment' from the retainage ledger to responsible party, sorted by dollars.

  6. 06

    Warranty phase

    Route owner warranty claims to the responsible sub with the record attached and track resolution.

Human in the loop

What stays your call.

  • Certificates of substantial and final completion and regulatory submissions are human-only.
  • Punch completion is human-verified; Walter tracks claims of completion as claims, not as done.
  • Final lien waiver collection follows the pay-application gate and can't be bypassed.

What you get

Outputs.

  • Closeout register
  • Punch lists by sub with retainage linkage
  • O&M and warranty completeness reports
  • Completion packages
  • Blocking-final-payment report