PM · Field · Public-project

RFIs

Replace the forward–wait–follow-up–distribute loop.

Walter runs the RFI pipe end to end: it normalizes the question, pins it to the right drawing revision, routes it to the responsible design party, and chases the answer on the contract clock. You own the question's substance — the design professional owns the answer.

The problem

What this costs you today — and what Walter does instead.

The pain

RFIs sit in someone's inbox until they're suddenly blocking next week's pour.

With Walter

Every RFI gets a deadline from the contract response time and is tied to the schedule activity it blocks, so a critical-path question outranks a finish detail.

The pain

Field crews build from the wrong revision because the RFI cited last month's sheet.

With Walter

References resolve to the revision current at the question's date — revision-pinned citations, never a superseded sheet.

The pain

An answer quietly changes scope and nobody opens a change order in time.

With Walter

Every answer runs a consequence scan; if scope, cost, or time moves, Walter opens a ChangeEvent and hands it to change orders — the link where contractors lose money.

The workflow

How Walter runs it.

  1. 01

    Intake

    Normalize the question, attach revision-pinned sheets and spec sections, and check prior RFIs — if it's already answered, you get the citation instead of a duplicate.

  2. 02

    Categorize & route

    Determine discipline, priority, and responsible party from the project directory and communication protocol, then draft the transmittal.

  3. 03

    Clock

    Set the response deadline from the contract and tie priority to the schedule activity it gates.

  4. 04

    Chase

    Reminders at 50%, 80%, and overdue with escalating tone; overdue and critical-path drafts a formal delay letter for the PM.

  5. 05

    Distribute

    On response, push the answer to the original asker plus every affected trade by graph traversal, update the log, and close the deadline.

  6. 06

    Consequence scan

    If the answer changes scope, open a ChangeEvent and hand it to change orders to start the notice clock.

Human in the loop

What stays your call.

  • Walter never answers design questions — it may attach relevant excerpts, but the response of record comes from the design professional.
  • Routing to external parties and formal delay letters are never autonomous.
  • Distribution may never narrow: everyone on the original RFI sees the answer.

What you get

Outputs.

  • Routed RFI transmittals
  • Live RFI log with ball-in-court and age
  • Reminder and escalation drafts
  • Answer distributions
  • ChangeEvent handoffs