PM · Project Engineer · Public-project

Submittals

Own the register and the compliance screen; the design team keeps approval.

Walter extracts the submittal register straight from the spec book, ties every item to the activity it gates, screens incoming packages against spec requirements line by line, and tracks the review clock. It informs — it never approves.

The problem

What this costs you today — and what Walter does instead.

The pain

The submittal register is built by hand from a thousand-page spec book — if at all.

With Walter

Walter extracts every SUBMITTALS article into a register with item, spec section, type, responsible sub, and review cycle. You verify it once; it becomes the system of record.

The pain

An unapproved submittal blows a lead-time window and stalls installation.

With Walter

Each item is back-scheduled from install date minus review cycles minus fabrication and shipping, so required-submit-by dates surface before they're a problem.

The pain

Deviations from spec slip through review unnoticed.

With Walter

On intake, Walter checks documents, model numbers, and performance values against the spec and flags every deviation with its citation.

The workflow

How Walter runs it.

  1. 01

    Register

    Extract every submittal requirement from the spec book into a register; you verify once, then it's the source of truth.

  2. 02

    Schedule-link

    Connect each item to the activity it gates and compute required-submit-by dates backward from install.

  3. 03

    Intake & screen

    Check completeness, model numbers, and performance values against spec; flag deviations line by line with citations.

  4. 04

    Substitutions

    Detect or-equal and substitution requests and route them through the contract's stricter substitution procedure.

  5. 05

    Route & track

    Transmit to the reviewer, track the contractual review clock, and remind at 50%, 80%, and overdue.

  6. 06

    Returns

    Log the action, restart Revise-Resubmit cycles with a recomputed risk date, and release the procurement hold on approval.

Human in the loop

What stays your call.

  • Walter never marks a submittal approved — it only records the design professional's action.
  • Compliance flags cite the spec section and the exact submitted value; no uncited rejections.
  • Approved-as-Noted markups that change scope or cost open a ChangeEvent.

What you get

Outputs.

  • Submittal register
  • Compliance screen reports
  • Transmittals
  • Ball-in-court log
  • Lead-time risk report